Просмотр содержимого документа
«Презентация к уроку "Kostroma"»
Kostroma
The Ipatiev Monastery is a male monastery, situated on the bank of the Kostroma River just opposite the city of Kostroma.
the Ipatiev Bell Tower
the Trinity cathedral
The territory of the Ipatiev Monastery is divided into two pats:
the ‘old town’ and
the ‘new town’. The center of the ‘old town’ is the Trinity cathedral which was built in 1586.
There is the Ipatiev Bell Tower which is famous for its design.
At the beginning of the 20 century the Ipatiev Bell Tower was decorated with frescoes with evangelical plots from the top to the bottom.
The museum of wooden architecture appeared in Kostroma in 1958.
Houses, barns, bath-houses, four mills, wooden churches and chapels were moved there from different parts of the Kosroma region.
The Windmill
The Chapel
This church from the village Spas-Veshi was made without any nails, just pure handcraft.
The Church of Our Lady was built in 1552, is claimed to be the oldest construction of the Kostroma region.
The Monument of Yuri Dolgorukiy
This monument to Ivan Susanin was put up in Kostroma in 1967.
The first is a Fire Tower with a little museum of fire-fighting, that is 35 meters high. The Fire Tower is the symbol of Kostroma and the Kostroma region.
Look at this small statue of a dog. First it was planned to make a monument to the dog Bobka, who helped firefighters save lives and pull children out of burning houses. But it was built as a dog with a coin box. Money from it go to the charity for homeless animals in the center of Kostroma.
This is the Museum of flax and birch bark. Here you will listen about manufacturing of linen products, work of the old Russian weavers.
This Church of the Resurrection is a real treasure of Kostroma. This is the only surviving church in Kostroma of the XVII centery and it is one of the first stone buildings.
The Ostrovsky’s pavilion stands high above the river on the mound, which remained from the ancient Kostroma Kremlin.
The Church (Воскресения Христова)?
The Rooks have come back was painted by Savrasov near this church in Kostroma.
Bogoyavlensky Convent
The Kostroma Gostiny Dvor
The Church (Спаса Преображения в Спасской слободе)?