This rubric was made for the project assessment and can be useful as example of rubric building.
Project Planning Rubric
Slobodyuk A.V
Voykin A.A.
The type of criteria |
5 |
4 |
3 |
2 |
Content |
Whole set out the information, a deep study of the sources, there are no gaps in the material |
Integrally provided information, the data is qualitatively treated; there are small gaps in the presented material |
Patchy, poorly processed data; there are gaps in the presented material |
Fragmentary information, raw data, a large number of gaps in the presented material |
The structure of the plan |
The plan is convenient for operation and doesn’t have any flaws in the construction of the question |
The plan is correctly structured |
The plan has errors or omissions |
The plan is wrong or missing |
The timing of the project |
The implementation of the plan ahead of schedule |
Implementation of the plan in time |
Implementation of the plan with a slight delay |
Implementation of the plan with a long delay or the failure of the project |
Team work and its effectiveness |
Perfect team work and dedication of each participants |
Good team work and participation of each student in the project |
In general, the successful work of the team, but not all students were participated |
Not all students participated in the project, or the project was prepared only by a part of the group |
Critical thinking |
All reasoning is short, clear, understandable and easy to repeat |
All reasoning are clear and understandable |
Some difficult with reasoning, but they are satisfactory to understand |
Reasoning is unclear and have many mistakes |
Problem solving |
The group revealed the theme of the project in full, almost without encountering difficulties |
The group has managed to disclose the topic of the project and resolve issues |
The group spent a significant amount of time, but deal with the problems of the project |
The group was lost before the arisen problems and was unable to solve them |
Protection of project results |
Using of unusual and correctly made ways of the project’s presentation |
The use of traditional ways of presenting material with good theoretical and practical base |
The use of traditional ways of presenting material with satisfactory theoretical and practical base |
Weak theoretical and practical base or the project is not ready to defend |